Bird Construction
Contract Period – 50 Weeks
The project consisted of the construction of a 56,516 sq feet, state of the art facility showroom with new technology ranging from the state of the art car wash and a 25 seat amphitheater, 710 car parking spaces and 15 service bay.
Our brief involved all groundworks, foundations, external drainage, with extreme weather conditions and close proximity to the Athabasca River with presence of a high water table, a weeping tile system was used for internal drainage where all water was collected and pumped from inside the building to the external foul line system. Water mains were installed through the site and mainline connections done, there was a significant re-routing of existing services including electrical, telecoms and gas old and new and all external finishes.
The project was complete on time and on budget within a challenging northern climate.